h t t p : / / w w w. w i n c h e s t e r r a i l w a y m o d e l l e r s . c o . u k / | |||||||||
h t t p : / / w w w. w i n c h e s t e r r a i l w a y m o d e l l e r s . c o . u k / | |||||||||
home about layouts chairman's chatter programme exhibition diary gallery contact links | |||||||||
CHAIRMAN'S CHATTER | |||||||||
Chairman's
Chatter is compiled quarterly
by our Chairman John Shaw. John summarizes the latest developments in the club
covering general news, exhibition reports,
developments in the clubs layouts, and any other notices. To
view a Chairman's Chatter simply click the relevant link, or scroll
down for the latest edition.
The current year, and previous year, chairmans chatter's are available by foillowing these links. Previous years Chairmans Chatter are available in the archive. |
|||
Feb 14 | Jul 14 | Oct 14 | |
Jan 15 | Apr 15 | Jul 15 | |
Oct2015
OO Gauge Matters Work has progressed on the
items that were described in the last Chairman’s Chatter. Baseboard
Protection The manufacture and
fitting of each pair of end-boards has been completed. Fiddle
Yard Trackwork Identification A gantry has been
constructed that clearly identifies the “track number” of each of the many
tracks. Wiring Testing of the wiring
on all boards has been complied with. Appropriate wires to the tracks and
pointwork are complete. The wires are neatly laid and glued to the board and
termination to the associated tag strips is nearly complete. The wiring of switching
relays to appropriate frogs is complete. Control
System & Boxes The control system
design was finalised and the master control box constructed. The wiring from the
baseboards (sections and point servos) is part of the overall control system
with relevant DC and DCC sections being switchable. Buildings
and Scenics Work has continued within
the sleeper works area with painting of rails and ballasting. The Gantry signal on
the causeway has been completed. Consideration continues over the locations and
sizes of the many buildings that are part of the works. This aspect needs to be
finalised as soon as possible so that construction can commence
EM
gauge Matters Minor repairs have been made to the track to enable more practice with running operations O
gauge Matters
Other
Business
|
|||
home about layouts chairman's chatter programme exhibition diary gallery contact links | |||
This website is best viewed at a minimum screen resolution of 1024x768. Content is © Copyright Winchester Railway Modellers 2004-2012. |