h t t p : / / w w w. w i n c h e s t e r r a i l w a y m o d e l l e r s . c o . u k / | |||||||||
h t t p : / / w w w. w i n c h e s t e r r a i l w a y m o d e l l e r s . c o . u k / | |||||||||
home about layouts chairman's chatter programme exhibition diary gallery contact links | |||||||||
CHAIRMAN'S CHATTER | |||||||||
Chairman's
Chatter is compiled quarterly
by our Chairman John Shaw. John summarizes the latest developments in the club
covering general news, exhibition reports,
developments in the clubs layouts, and any other notices. To
view a Chairman's Chatter simply click the relevant link, or scroll
down for the latest edition.
The current year, and previous year, chairmans chatter's are available by foillowing these links. Previous years Chairmans Chatter are available in the archive. |
|||
Jan 15 | Apr 15 | Jul 15 | Oct 15 |
Jan 16 | Apr 16 | Jul 16 | Oct 16 |
Jan 2017
OO Gauge Matters Exhibition We have agreed to the include the layout in the upcoming
exhibition in Brockenhurst on the 28/29th May. The layout will not
be finished at that time as much work remains to be completed before the event
date. However, but we do expect to have all of the trackwork, the control
systems and some items of scenery completed. Work has continued on completing the control, system.
Several changes have been made since the last detailed report in June 2016. It
is expected that a detailed operating manual will be produced to enable all to
understand it. Work has progressed rapidly on the rail and
road bridge’s over the causeway. Both are now in place along with the approach
roads and interface with the river, as well as the old bridge. Work has continued on the proposed layout for the sleeper building structures, using mostly card but with some brass/plastic components. The final arrangements are to be completed. The narrow gauge Trackwork and pointwork leading into the creosote plant has been constructed using 2 mm gauge rail and brass sleepers The Romsey route Trackwork has been laid and requires ballasting.
The 3rd RailAfter looking at some the options available the
system components have been agreed being 3rd rail section and the insulators
using brass pins suitably modified
EM
gauge Matters
O
gauge Matters
Other
Business
|
|||
home about layouts chairman's chatter programme exhibition diary gallery contact links |
|||
|